Migrating to Sybase Adaptive Server Enterprise 11.5 D-17
Adaptive Server Enterprise 11.5 Staged Cutover Task Overview
5. Upgrade the production system to Release 11.5.
6. Run
dbcc commands (checktable,checkalloc, checkcatalog) on the Release
11.5 databases. Be sure to verify the
dbcc log and error log.
7. “Baseline” the Release 11.5 configuration on the production
system.
8. Perform user testing and verification.
Perform Final Steps
1. Start production users on the Release 11.5 production system.
2. Upgrade the test system to Release 11.5.
Staged Cutover Task Overview
This sample task overview covers a staged cutover migration
approach to rebuild SQL Server. The scenario for this task list is:
The large company has a mature client/server environment with
multiple applications residing on a single SQL Server.
In the event of failure, the company depends on nightly backups
and transactions dumps. The system cannot be down more than
one hour and cannot afford more than two hours of data loss.
The environment includes development, test, and production
platforms. It requires enough space for duplicate servers on each
platform.
The object-level rebuild strategy necessitates moving the data,
which requires system downtime for the target application.
Tasks
The high-level tasks in this scenario are:
1. Configure Adaptive Server 11.5 on the development system,
duplicating the SQL Server 10.x development configuration.
2. Migrate the development objects to the Release 11.5
development system.
3. Construct regression test suites.
4. Construct
bcp scripts to move object deltas.
5. “Baseline” the Release 10.x test environment.