APPENDIX B Sample Migration Task Lists
119
Perform User Acceptance Tests
1 Perform acceptance tests.
2 Compare acceptance test results to baseline.
3 Analyze acceptance test results.
4 Perform corrective actions.
5 Retest as necessary.
6 Document acceptance test results.
7 Obtain user signoff on acceptance test results.
Perform Production Data Refresh
1 Schedule production data cutover.
2 Extract production data.
3 Move data to target.
4 Load data into Adaptive Server production environment.
5 Backup new environment.
6 Notify users of data refresh.
Parallel Migration Task List Example
This sample task list covers a parallel migration with replication approach
to upgrade an older system to Adaptive Server Enterprise 12.5.
The scenario for this task list is:
A major telecommunications company cannot afford system
downtime for the upgrade.
In the event of failure, the system cannot be down more than 15
minutes and the company cannot afford more than 1 hour of data loss.
The migration must support these contingency requirements if a
production back-out is required.
This example does not repeat the preparation steps to given in the previous
example. The task lists for this example include: